7.9.2013
EN
Official Journal of the European Union
C 260/21
Request for a preliminary ruling from the Verwaltungsgerichtshof (Austria) lodged on 24 May 2013 — T-Mobile Austria GmbH v Telekom-Control-Kommission
(Case C-282/13)
2013/C 260/35
Language of the case: German
Referring court
Verwaltungsgerichtshof
Parties to the main proceedings
Appellant: T-Mobile Austria GmbH
Respondent authority: Telekom-Control-Kommission
Interveners: Hutchison 3 G Austria Holdings GmbH, Hutchison 3G Austria GmbH, Orange Austria Telecommunication GmbH, Stubai SCA, Orange Belgium SA, A1 Telekom Austria AG
Additional party: Bundesministerium für Verkehr, Innovation und Technolgie
Question referred
Are Articles 4 and 9b of Directive 2002/21/EC (1) of the European Parliament and of the Council of 7 March 2002 on a common regulatory framework for electronic communications networks and services (Framework Directive) and Article 5(6) of Directive 2002/20/EC (2) of the European Parliament and of the Council of 7 March 2002 on the authorisation of electronic communications networks and services (Authorisation Directive) to be interpreted as meaning that they confer on a competitor the status, in a national procedure under Article 5(6) of the Authorisation Directive, of an undertaking which is affected within the meaning of Article 4(1) of the Framework Directive?
(1) OJ 2002 L 108, p. 33.
(2) OJ 2002 L 108, p. 21, amended by Directive 2009/140/EC of the European Parliament and of the Council of 25 November 2009 amending Directives 2002/21/EC on a common regulatory framework for electronic communications networks and services, 2002/19/EC on access to, and interconnection of, electronic communications networks and associated facilities, and 2002/20/EC on the authorisation of electronic communications networks and services (OJ 2009 L 337, p. 37).